Demolition Services

Selective interior demolition and full structural demolition, sequenced behind abatement.

Demolition and abatement belong to the same conversation. Federal rules require regulated material to come out before a structure comes down, and a demolition contractor who discovers asbestos mid-job has stopped work. Handling both under one contract removes the seam where most demolition schedules fail.

Scope of work

  1. 01

    Pre-demolition survey

    Identify regulated material before anything is touched. NESHAP requires a thorough inspection prior to demolition, and it applies whether or not asbestos is found.

  2. 02

    Abatement

    Remove regulated material under containment so the structure is clean before the machines arrive.

  3. 03

    Utility disconnection and protection

    Confirm disconnections, protect adjacent structures, and set up dust and noise control appropriate to the surroundings.

  4. 04

    Demolition

    Selective interior demolition where the building stays, or structural demolition where it does not, with debris segregated as it comes down.

  5. 05

    Site restoration

    Debris removal, recycling where the stream supports it, backfill and grading to leave the site in the agreed condition.

The regulations that govern it

General guidance on the standards that apply to this kind of work. Requirements vary by jurisdiction and by project — confirm the specifics for yours before you rely on them.

  • NESHAP requires a pre-demolition asbestos inspection and notification for every demolition, regardless of findings.
  • OSHA 29 CFR 1926 Subpart T governs demolition operations.
  • Local permitting, and in Philadelphia a considerably stricter demolition regime, applies on top.